Sembcorp Utilities UK, Wilton Island, for four auxiliary steam boilers with a degasifier and five feed water pumps, including all auxiliary equipment, such as a compressor, air dryers, dosing sampling and analyser systems for which Powerspex carried out the automation of both the electro-technical and the control technical components.

 

The assignment

Supplying, installing and commissioning the entire boiler island including:

  • engineering the earthing plan for the boiler island;
  • engineering, supplying and installing the lighting plan;
  • engineering, installing and commissioning all instrumentation and control valves;
  • engineering, supplying, installing and commissioning MCCs (2x 1000KVA);
  • engineering, supplying, installing and commissioning 5x BMSs and 1x Aux;
  • engineering, supplying, installing and commissioning the UPS system;
  • engineering, supplying, installing and commissioning the gas and flame detection system;
  • engineering, supplying, installing and commissioning the lighting system;
  • engineering, supplying and installing the instrument and power cables.

 

Result

An overview of the automation solutions is shown in the Appendix.